A batching plant has to design mixes based around historic results. A statistical analysis of the results can then be made and a result called the Standard Deviation (SD) gives the spread of the results around a mean value. British and EU law states that the design strength of the concrete mix must be at a point that is 2x Standard Deviations below the mean value. This means that the probability of batches will be below the design strength is only approximately 2.275%.
| Potential (worst case) uncompensated water | |||
|---|---|---|---|
| Material | Your Recipe (Dry Weights) | Utilizando la tolerancia de medición existente (Manual) | With Hydronix |
| Fine Sand 0 - 2mm | 545 | 16.35 | 1.09 |
| Coarse Sand 0 - 4mm | 377 | 0.00 | 0,75 |
| Gravel 8 - 16mm | 770 | 0.00 | 1.54 |
| Other Aggregates | 220 | 0.00 | 0,44 |
| Weight of uncompensated moisture | 0 | 16.35 | 3.82 |
| Total Weight | 1912 | 1928 | 1916 |
| OPC | 265 | 0.00 | 0.00 |
| PFA | 0 | 0.00 | 0.00 |
| GGBS | 0 | 0.00 | 0.00 |
| Other Cement Replacements | 0 | 0.00 | 0.00 |
| Total Cementitious Materials (Binder) | 265 | 265 | 265 |
| Mix design water (litres) | 175.00 | 175.00 | 175.00 |
| uncompensated Water in Aggregates (litres) | 0.00 | 16.35 | 3.82 |
| Total Water in mix (litres) | 175.00 | 191,35 | 178,82 |
| Designed W/C ratio | 0,66 | 0,66 | 0,66 |
| Produced W/C ratio | 0,72 | 0,67 | |
| Total Cement Needed to maintain SD target | 289,76 | 270,79 | |
| Extra cement needed to maintain SD target | 24,76 | 5,79 | |
| Potential cement cost by not using Hydronix moisture measurement | 18,97 | kg/m3 | |
| Extra Cement required to maintain w/c ratio per year | 1092.55 | Tonnes | |
| Cost of not using Hydronix per m3 | £/$/€ 11116.54 | ||
| Cost of not using Hydronix per year | £/$/€ 640.312.834,768 | ||
| Environmental Cost of not using Hydronix per year | 1.013.889,66 kgCO2e/t | ||