A batching plant has to design mixes based around historic results. A statistical analysis of the results can then be made and a result called the Standard Deviation (SD) gives the spread of the results around a mean value. British and EU law states that the design strength of the concrete mix must be at a point that is 2x Standard Deviations below the mean value. This means that the probability of batches will be below the design strength is only approximately 2.275%.
So a 38 N/mm2 with a W/C ratio of 0.605 and a water quantity of 200 l/m3 would need 331kg of cement. A 34N/mm2 mix has a W/C ratio of 0.660 and so will only need 303kg of cement presuming the water demand is constant. This still gives the same design strength of C30 but saves 28kg of cement per m3!
  Potential (worst case) uncompensated water
Material Your Recipe (Dry Weights) Using existing measurement tolerance (Automatic) With Hydronix
Fine Sand 0 - 2mm 683 6.83 1.37
Coarse Sand 0 - 4mm 360 3.60 0.72
Gravel 8 - 16mm 718 7.18 1.44
Other Aggregates 210 2.10 0.42
Weight of uncompensated moisture 0 19.71 3.94
Total Weight 1971 1991 1975
OPC 300 0.00 0.00
PFA 0 0.00 0.00
GGBS 50 0.00 0.00
Other Cement Replacements 0 0.00 0.00
Total Cementitious Materials (Binder) 350 350 350
Mix design water (litres) 285.00 285.00 285.00
uncompensated Water in Aggregates (litres) 0.00 19.71 3.94
Total Water in mix (litres) 285.00 304.71 288.94
Designed W/C ratio 0.81 0.81 0.81
Produced W/C ratio 0.87 0.83
Total Cement Needed to maintain SD target 374.21 354.84
Extra cement needed to maintain SD target 24.21 4.84
Potential cement cost by not using Hydronix moisture measurement   19.36 kg/m3
Extra Cement required to maintain w/c ratio per year   484.11 Tonnes
Cost of not using Hydronix per m3 £/$/€ 9682.11
Cost of not using Hydronix per year £/$/€ 242,052,631.579
Environmental Cost of not using Hydronix per year 449,249.68 kgCO2e/t

Related Articles

Moisture Measurement – an Essential for Automating Concrete Production

The current worldwide health challenges are causing many organisations to adjust their working practices to minimise the staff involved in a site whilst still managing full production schedules. Automation is…

Read more

Capturing and using moisture measurement data: ‘Big Moisture’

For many industries, measurement and control of the moisture in materials is vital. Whether it be adding the incorrect amount of water spoils the product or over-drying it wastes energy,…

Read more